Metalwork for garden path
It was a cold day today, and wet at the end. Activity was muted, with some work on the final border for ball court surface left half-finished.
One of the yellow-jacketed engineering/surveying staff was back, and lines for the garden path have been painted on the ground for what seems like the third time. The arrival of the metalwork shown in the picture suggests some imminent construction in the garden area.
0 Comments:
Post a Comment
<< Home