Carpentry
I noticed something missing today: the big digger (and its driver). It must have been taken away last Friday.
At one end of the site, today, there was a lot of carpentry as the fence for the Meeting House Garden was constructed — or, more likely perhaps, this is the wooden mould into which more concrete will be cast.
At the other end of the site, it turns out the brown pile that was delivered last Tuesday is cement mix, which was mixed up and then spread in the small wooden moulding on the far side of the ball court.
0 Comments:
Post a Comment
<< Home