Finishing the fence
The guys in this photo aren't the same 'yellow jackets' that I've referred to before: they're from fencing specialists Zaun and today they more or less completed the fence on three sides of the ball court. This now includes two doors/gates. One panel is missing, and presumably this gap will be used for bringing in the final surface of the court, plus any 'furniture' (ball hoops etc).
At the start of the day a lorry delivered three more piles of surface material. The distinctive brown pile was then ferried by the shovel-buggy down to the corner of the site where the Chequer Street entrance will be. And the digger dug a narrow trench leading to the Banner Street entrance, along the yellow line that was drawn yesterday and is partly visible in this photo.
0 Comments:
Post a Comment
<< Home